2
S19-110HFP Installation
5/25/2012
WARNING
Read this installation manual completely to ensure proper installation, then file it
with the owner or maintenance department. Compliance and conformity to drain
requirements and other local codes and ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before
discarding any packaging material. If any parts are missing, do not begin installation
until you obtain the missing parts.
Flush the water supply lines before beginning installation and after installation is
complete. Test the unit for leaks and adequate water flow. Main water supply to the
eyewash should be “ON” at all times. Provisions shall be made to prevent unauthorized
shutoff.
The ANSI Z358.1 standard requires an uninterruptible supply of flushing fluid at a
minimum 30 PSI (0.21 MPa) flowing pressure. Flushing fluid should be tepid per ANSI
Z358.1.
The inspection and testing results of this equipment should be recorded weekly
to verify proper operation. This equipment should be inspected annually to ensure
compliance with ANSI Z358.1.
Workers who may come in contact with potentially hazardous materials should be
trained regarding the placement and proper operation of emergency equipment per
ANSI Z358.1.
Installation
THIS
SIDE
UP
Packing List
P.O.Box309, Menomonee Falls, WI 53051
R
TESTTHISUNIT EACHWEEK
Test-operatevalve(s) each week and sign below.
Reportanymalfunctions immediately.
Ventil(e)wöchentlich im Testbetrieb prüfen, bestätigt
durchUnterschrift. Jegliche Störung sofort melden.
Date
Datum
Date
Signed
Unterschrift
Signe
Date
Date
Date Signed
Signed
Signed
DIESESGERÄT1ST WÖCHENTLICH ZU PRÜFEN.
ESSAIHEBDOMADAIRE
Testle fonctionnement des valves chaque semaine et
signeen bas. S'il y à quelquechose qui ne va pas fait
unrapport immédiatement.
P.O.BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL:1-800-BRADLEY FAX:(262-251-5817)
114-051
Supplies Required:
3⁄8" floor anchors and bolts